EWCAP drawings require approval by a simple majority of the participating OEMs. Ĥ Req.#9 Review and obtain approval for any deviation from the USCAR/EWCAP footprint DRAWING REQUIREMENTS with the EWCAP/OEM projects committee.
Req.#8 Standard notice as shown in Appendix B is present in the upper right hand corner of the DRAWING. DXF & DWG formats are available at the USCAR-EWCAP website. Req.#7 Template / Title block must be used as shown in Appendix A. The last sheet will contain the signed and dated legal notice similar to shown in Appendix E. Additional sheets may contain the clearance envelope graphics and dimensions, optional construction. Alpha I, O, and Q are not used.) Unless space constrained, Notes will be placed on the right center of, the left side of Page one will show keying details the upper right corner of will haveanisometric view the upper center area of will show the two packaging views. The supplier identification box is located to the left of the title block above the part number schedule.ģ Req.#6 The DRAWING may consist of multiple sheets: The first sheet will show the interface detail, note field and revision table (Note: Revisions level are always letters. Req.#5 Supplier name (and optional logo) are shown on the DRAWING. If additional DRAWING space is required use multiple sheets. Req.#4 DRAWING size is A2 = 420 x 594 paper with 10mm border actual DRAWING space is 400 x 574. Req.#3 Where not controlled by the DRAWING guideline, the Geometric Dimensioning and Tolerancing standard ASME or latest revision is followed. Req.#2 Deliverables for data format and related information per Appendix C are supplied. Note: Physical changes to parts that make them incompatible with previous revisions require new part numbers ( 150-S-004-2-Z01 becomes 150-S-004-2-Z02).
Design errors are possible if this method is not Rev T 5/7 EWCAP DRAWING / drafting Location Feature A Features of Size B and C tolerances Logo for showing number table Template / Title Block Standard Additional deliverables with DRAWING Legal Check Sheet for confirming compliance3P105 Rev T GENERALEWCAP DRAWING /DRAFTINGREQUIREMENTS Req.Ģ #1 Part Number used is the next part number available in the category per ( #PartNumSys). General Motors, Ford and FCA US have agreed to accept drawings in the format listed. DRAWING authors should contact the EWCAP projects group if variances are needed. At the time an existing DRAWING is being revised it will be evaluated to determine if the format should be brought up to the latest drafting standard. Older designs are not expected to be revised to this format. Use the Checklist Summary Sheet (Appendix E) to verify DRAWING is ready to be sent to USCAR. Confirm compliance by confirming each of the REQUIREMENTS listed. Connector Floorġ DRAWINGREQUIREMENTSFORDEVICECONNECTORDRA WINGSP105 Rev T HOWTOUSEEWCAP DRAWING /DRAFTINGREQUIREMENTS This document is to be used to check newly-released drawings for use by EWCAP. General EWCAP Drawing/ Drafting Requirements 2. Design errors are possible if this method is not Rev T 5/7 EWCAP DRAWING / drafting Location Feature A Features of Size B and C tolerances Logo for showing number table Template / Title Block Standard Additional deliverables with DRAWING Legal Check Sheet for confirming compliance3P105 Rev T GENERALEWCAP DRAWING /DRAFTINGREQUIREMENTS Req.Ĭ ONTENTS 1. Example: tourism industry Search DRAWING REQUIREMENTS FOR DEVICE …ĭRAWINGREQUIREMENTSFORDEVICECONNECTORDRA WINGSP105 Rev T HOWTOUSEEWCAP DRAWING /DRAFTINGREQUIREMENTS This document is to be used to check newly-released drawings for use by EWCAP.